G-iron’s name is proudly featured among the more than 300 individuals currently working on the ambitious Arena S. Giulia project. The company was selected by Sinelec S.p.A., in partnership with Gianni Benvenuto and Elettromeccanica Galli, to provide low-frequency electromagnetic shielding.

G-iron’s role involved analyzing the electrical cabins powering the Arena and designing an intuitive, fast, and high-performance solution to mitigate the electromagnetic induction generated by these power sources. This ensures the protection of environments meant for prolonged human occupation, in accordance with the 8/7/2003 Prime Ministerial Decree.

G-iron ArmoFlex delivers exceptional shielding performance while offering rapid installation, a key advantage for a construction site with a targeted completion date of December 2025.